Thursday, February 19, 2009

Mini Project - Environment

Problem
Horribly long elevator waiting line in the building ( 2 W 13th St.) before class start times. The major cause of this problem is the inefficient use of the elevators (have each of them stops at almost every floor). This wastes time and causes long waiting line formed at the first floor.















Project Description
Purpose: Maximize the usage of limited resources.
Target Space: lobby at 2 W. 13th
Audience: people who have access to 2 W. 13th
Method: Design an environment that direct the users to designated elevators according to their destination.

Design Questions and Challenges
Best Practice - What's the best way to allocate elevators to floors?
Aesthetic - The design should not conflict with the original environment.
Flexibility - The design need to account for non-rush hour usage.

Precedents
1. Existing Elevator System Models









2. Innovative Traffic Control - Technology and Practice in Europe
http://international.fhwa.dot.gov/Pdfs/Innovtce.pdf


































3. NY Subway - 7 Express v.s. 7 Local












4. Portable-deflatable Led-Matrix
http://www.mediaarchitecture.org/















5. Restaurant Logo Projection















6. Philip Color Kinetics - NECA 2008




Design Plan


Elevator Assignment












On-floor lighting instructions and traffic direction layout












Operating Hours
8:40 am - 9:00am
11:40am - 12:00pm
2:40pm - 3:00pm
5:40pm - 6:00pm

User Scenario: Off-Peak Hours
































































User Scenario: Peak Hours


































































Strength & Weakness


Strength:
- Optimize Resources
- Blend in with original environment

Weakness
- Implementation Cost & Technical Possiblity
- Is the proposed elevator assignment the best practice?
- Human behavior - will people cooperate?

No comments: